Miwival Floating Ball Valve Flanged-Floating Ball Valve

Product Details
Spec Detail
Size Range 2″ – 12″ (50mm – 300mm)
Pressure Class ASME Class 150-2500
Standard Connections Flanged RF
Category: Brand:

Floating Ball Valve Flanged – Features & Benefits

As a trusted Floating Ball Valve Flanged Supplier, Distributor, and Stockist in Indonesia, we provide high-performance floating ball valves designed for tight shut-off isolation in liquid, gas, and general industrial pipeline applications.

The floating ball design ensures reliable downstream seat sealing under operating pressure, making it suitable for process pipelines, utility service lines, and EPC installations requiring dependable isolation performance.

Supply support includes production time of 10–20 working days with estimated delivery time of 3–4 weeks (Franco Jakarta).

Key Features:

  • Reliable Tight Shut-Off – Floating ball design ensures dependable sealing performance.
  • Full Bore Flow Path – Minimizes pressure drop across pipeline systems.
  • Soft Seat Sealing – Provides bubble-tight isolation for general service applications.
  • Flanged End Connection – Suitable for secure industrial pipeline installation.
  • Blow-Out Proof Stem – Improves operational safety and stem retention reliability.
  • Anti-Static Device – Maintains electrical continuity between body, stem, and ball.
  • Fire-Safe Design Option – Available for hydrocarbon service environments.
  • Automation Ready – Compatible with pneumatic and electric actuator systems.

Why Choose Our Floating Ball Valve Flanged?

  • Reliable isolation performance for industrial pipeline systems.
  • Suitable for liquid, gas, and utility service applications.
  • Available in multiple material configurations.
  • Suitable for retrofit and new EPC installations.
  • Fast supply coordination through Indonesia-based support (Franco Jakarta).
  • Technical consultation support for valve selection and application matching.

Industries Served:

  • Oil & Gas
  • Petrochemical & Refining
  • Chemical Processing Plants
  • Power Generation
  • Water & Wastewater Treatment
  • General Industrial Utilities
  • Pipeline & EPC Projects

Available Supply Support

We support procurement of Floating Ball Valve Flanged units for maintenance replacement, shutdown programs, and new installations with production time of 10–20 working days and estimated delivery time of 3–4 weeks (Franco Jakarta).

Contact us today for technical consultation and competitive pricing from your trusted Floating Ball Valve Flanged Supplier and Distributor in Indonesia.

Scroll to Top